Skip to content

Construction Scheduler - Memphis

SpaceXAI

AI · 170 postings open

  • Location: Southaven, MS · Memphis, TN
  • Pay: Pay not stated
  • Experience: 4+ yrs
  • Posted: Posted
Check your fit

What the posting requires

Required
  • Construction scheduling
  • CPM scheduling
  • Schedule updates
  • Risk management
  • Schedule impact analysis
  • Schedule maintenance
  • Schedule reporting
  • Critical path analysis
  • Schedule communication
Preferred
  • Forensic delay analysis
  • BIM 4D
  • Power BI
  • Navisworks
  • Earned value
  • Synchro

These tags are our reading of the posting. They can miss something; the original posting is the reference.

Do you qualify?

Each requirement checked against your resume, in about a minute. No account. Your resume is deleted when the verdict appears.

Check your fit